City Letter Carrier Training Manual

Route Evaluation and Adjustments

Section 4 — route inspections, mail counts, Form 3999, time evaluation, minor and COR adjustments, and grievance rights.

⚠️ Please Read

This crowdsourced website launched in August 2026, and much of its information is currently placeholder content. We’re asking mail carriers to help us identify errors and submit corrections as we add practical, professional insights from experienced carriers to every page.

🎯 4.1 Purpose of Route Evaluation

  • Ensure each city delivery route is adjusted to as close to 8 hours as possible.
  • Evaluate route workload fairly based on both office and street duties.
  • Identify routes that are overburdened or underburdened based on actual performance data.
  • Help balance workloads across routes for better service and carrier equity.
  • Form the basis for permanent or minor route adjustments through data review.

Reference: M-39 §211–212, Route Protection Program Ch. 1 & 2

🔍 4.2 Overview of the Route Inspection Process

  • Typically consists of a six-day mail count followed by one day of inspection.
  • Observers and route inspectors may accompany the carrier during street duties.
  • Data from PS Forms 1838-C, 3999, and 1840 are used to evaluate performance.
  • Carriers must be informed of the inspection date and count procedures in advance.
  • Any route changes must be based on accurate and jointly reviewed data.

Reference: M-39 §214, NALC 2018 Guide to Route Inspections

📊 4.3 Mail Count and Form 1838-C

  • Carriers are responsible for accurately recording volume of letters, flats, parcels, SPRs.
  • Form 1838-C includes daily mail counts, casing time, and withdrawal time.
  • Volume counts must be conducted consistently across the six-day period.
  • Supervisors or route examiners may assist or verify volume data.
  • Carriers should retain a copy of each day's entries for their own records.

Reference: Route Protection Ch. 1, Form 1838-C instructions

🗓️ 4.4 The Day of Inspection and Form 3999

  • Supervisors accompany the carrier on the street to observe and record activity.
  • Form 3999 documents actual street travel, delivery stops, and line of travel.
  • Carriers should follow normal practices—no speeding or artificial delays.
  • Any abnormal conditions (e.g., construction, detours) must be noted on the form.
  • A discussion should follow where carriers can review and comment on the 3999 data.

Reference: Route Protection Ch. 1, M-01766 Ch. 2

⏱️ 4.5 Office and Street Time Evaluation

  • Office time includes casing, pull-down, handling accountables, and loading.
  • Street time includes travel to/from route, delivery, relays, pickups, and scanning.
  • Data from the week and inspection day are compared to standard performance expectations.
  • Excessive or deficient times must be fully explained before any route change.
  • Adjustments must reflect consistent, not one-time, workload patterns.

Reference: M-39 §213, IOCS Handbook F-45, Route Protection Ch. 3

🔧 4.6 Minor Adjustments (Section 141 of M-39)

  • Minor adjustments can be made without a full inspection if based on documented data.
  • Examples include shifting deliveries between routes or correcting travel patterns.
  • These changes must be recorded on PS Form 1840 Reverse.
  • Carriers and union representatives should be notified and given the rationale.
  • Minor adjustments should not be used to bypass full inspections where warranted.

Reference: M-39 §141, Route Protection Program Ch. 3

🗺️ 4.7 Computerized On-Site Route (COR) Adjustments

  • COR is a mapping software used to propose route changes using PS Form 3999 data.
  • Time deductions must be explained and documented on PS Form 1840 Reverse.
  • COR cannot replace the need for proper consultation with the carrier.
  • Carriers and NALC representatives should review COR territory transfers for fairness.
  • Any route realignments made through COR must comply with M-01661 settlement (see M-01766).

Reference: M-01766 Guide to COR, Ch. 4–7

⚖️ 4.8 Consultation and Grievance Rights

  • Carriers must be given an opportunity to review PS Forms 1840 and 1840 Reverse.
  • Management must hold a consultation with the carrier before final adjustments.
  • Carriers may include written comments or objections on the forms.
  • If disagreement exists, carriers should contact their shop steward immediately.
  • Contractual rights allow grievances over improper inspections or adjustments.

Reference: M-39 §242.3, Route Protection Ch. 1, ELM §666.2


💡 Want to make a comment?

Do you have an idea or way of doing things that you would like members to know about? Sign in to leave a comment and we might use your idea in our training and Union pages.

Sign in to Leave a Comment